Today’s LiveWire Spotlight examines the ERO’s Revised Long-Term Strategy Document used by NERC and the Regions to identify and address threats to the BPS. Two driving factors are cited:
- Significant social and structural change since the dissolution of FRCC and SPP, leaving six Regional Entities of similar size and complexity.
- Major policy, technical, and commercial forces that are rapidly changing the way the electric system is designed, planned, operated, and secured.
The initial draft of the ERO Enterprise’s Long-term Strategy document is available for a twenty-day stakeholder review and commentary period. Feedback must be returned to Erika Chanzes at erika.chanzes@nerc.net by October 1, 2019.