fbpx

Today’s LiveWire Spotlight examines the ERO’s Revised Long-Term Strategy Document used by NERC and the Regions to identify and address threats to the BPS.  Two driving factors are cited:

  1. Significant social and structural change since the dissolution of FRCC and SPP, leaving six Regional Entities of similar size and complexity.
  2. Major policy, technical, and commercial forces that are rapidly changing the way the electric system is designed, planned, operated, and secured.

The initial draft of the ERO Enterprise’s Long-term Strategy document is available for a twenty-day stakeholder review and commentary period.  Feedback must be returned to Erika Chanzes at erika.chanzes@nerc.net by October 1, 2019.