Today’s LiveWire Spotlight examines NERC’s efforts to transition the “Guidelines and Technical Basis” sections of ten Reliability Standards to stand-alone Technical Rationale documents. Experts in operations & data exchange, modeling & long-term planning, personnel & emergency planning, and system performance determined that no material changes needed to be made during the transition.
The Technical Rationale Transition Second Grouping have been posted a 45-day review period and a concurrent non-binding poll. Clients have until April 20, 2020 to provide their comments back to the drafting team and place their ballots.