fbpx
Today’s LiveWire Spotlight looks at BAL-002-2 Draft 6, the updated version of the Disturbance Control Performance (DCP) standard. It consists of two requirements and multiple Glossary terms that establish continent-wide uniformity in the performance expectations and reporting of a balancing contingency.

The sixth draft of BAL-002-2 and its supporting materials have been posted for a 45 day review period with a concurrent ballot. Clients have until March 16, 2015 to return their feedback to the project team and vote on the standard.