fbpx
Today’s LiveWire Spotlight focuses on Project 2010-05.2, which looks to update all Protection and Control (PRC) standards governing the design, performance, operations, and maintenance of Special Protection Systems (SPS) and Remedial Action Schemes (RAS). This includes the three in-effect and the three “fill-in-the-blank” SPS standards applicable to the Regional Entities which FERC never approved.

The initial draft of the Standards Authorization Request for Project 2010-05.2 has been posted for a 30 day review period. Clients have until March 19, 2014 to provide comments back to the drafting team.