Today’s LiveWire Spotlight looks the second draft of PRC-005-3 which will apply recloser relays located at or near to a substantive generation facility, or are part of a Special Protection System. The latest versions adds precision to the technical content of the standard and the supplementary reference document based upon industry stakeholder commentary regarding the initial postings.
The second drafts of PRC-005-3 and its supporting documentation have been posted for a 45 day review period and subsequent vote. Clients have until August 23, 2013 to return feedback to the project team and cast their ballots.