fbpx

Today’s LiveWire Spotlight article concerns the latest version of MOD-026-1 addressing the regular verification of generator voltage response modeling data used by Transmission Planners in dynamic performance simulations. It is the first of five recently-issued draft PRC and MOD Standards intended to increase generator availability to the BES without risking equipment damage.

The third draft of MOD-026-1 and its supporting documents have been posted on the NERC website for a 30-day review and successive ballot. Clients have until March 29, 2012 to return feedback to the project team and vote on the Standard.